天美传媒麻豆mdxxxx-天美传媒免费-天美传媒免费观看一二三在线-天美传媒免费全集观看-天美传媒免费网站入口-天美传媒入口曝光

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16595

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 波多野结衣在线观看网址 | a级高清毛片 | 日韩视频高清免费看 | 麻豆一二三区av传媒 | 2024年国产高中毛片在线视频 | 国产精品点击进入在线影院高清 | 很黄很色60分钟在线观看 | 丁香社区五月开心激情婷婷 | 三级免费网址 | 欧美日韩一区二区 | 欧美婷婷五月基地 | 伦理片高清在线观看网站 | 久久精品一区二区三区免费看 | 日韩精品一区二区 | 囯产精品久久久久久久久久妞妞 | 久久免费99精品久久久久久 | 婷婷婷色 | av在线免费网站 | 狠狠色噜狠狠狠狠 | 欧美精品成人一区二区在线观看 | 国产福利一区二区三区高清 | 久久久久国色av免费观看性色 | 亚洲韩国日本欧美一区二区三区 | 手机中文字幕在线视频 | 亚洲精品久久AV无码麻小说 | 国产三级av国片免费 | 国产精品无码无卡无需播放器 | 国产乱子伦手机在线 | 日日夜夜免费精品综合网 | 久久综合亚洲鲁鲁五月天欧美 | 亚洲欧美人成无码苍井空 | 亚洲国产成人一区二区三区 | 一级a性色生活片久久无少妇一级 | 精品亚洲av无码啪啪激情 | 日本中文字幕在线观看视频 | 日本-区一区二区三区A片 | 精品亚州毛片在线免费观看 | 丰满多毛少妇做爰视频爽爽和R | 国产欧美精品 | 丰满少妇一区二区 | 日韩美女免费视频 |