天美传媒麻豆mdxxxx-天美传媒免费-天美传媒免费观看一二三在线-天美传媒免费全集观看-天美传媒免费网站入口-天美传媒入口曝光

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

16618

Prev Next
×
主站蜘蛛池模板: 久久国产露脸精品国产麻豆 | 欧美一级中文字幕 | 亚洲丶国产丶欧美一区二区三区 | 九九久久99综合一区二区 | 色婷婷一区二区三区AV免费看 | 黑人大战白人欧美系列 | 高清欧美性狂猛bbbbbbx | 精品视频在线观看免费无码 | 一区 国产 视频 页 精品综合跳转 | 国产成人黄色网站视频在线观看 | 美国毛片一级视频在线aa | 狠狠做五月深深爱婷婷 | 久久免费观看视频 | 桃色激情五月天 | 精品久久成人免费第三区 | 日韩人妻无码精品系列 | 久久久www免费人成精品 | 久久国产三级精品 | 国产成人精品第一区二区三区 | 色欲色香天天天综合网图片 | 日韩a人毛片精品无人区乱码 | 亚洲 欧美 制服 另类 无码 | 国产AV国片偷人妻麻豆 | 国产精品国产精品国产精品 | 人妻无码αv中文字幕久久琪琪布 | 亚洲无人区码二码三码区别图 | 国产女人精品视频国产灰线 | 少妇做爰特黄A片免费看9588 | 国产成人AV三级三级三级 | 亚洲蜜桃精久久久久久久久久久久 | 精品欧美日韩一区二区三区 | 亚洲夜夜欢a∨一区二区三区 | 国产精品免费久久久久影院 | 精品国产久一区二区三区 | 99久久久无码欧美精品性 | 欧美亚洲国产大片在线看 | 国产精品成人无码视频 | 国产一区二区无码蜜芽精品 | 亚洲午夜精品一级在线 | 老熟妻内射精品一区 | 麻豆精品一区二区三区高清 |